Hekmat office building

  • project profile

    Project location:

    Tehran-Iran

    Number of buildings:

    3 buildings

    Systems:

    • HVAC control systems
    • Lighting control systems
    • Power control

    Project value:

    1,200,000 $

    Project Finished date:

    1395

    Project Status:

    Completed

  • Target

    • Energy saving
    • HVAC & lighting energy saving
    • Controlling all intelligent systems
    • Improving building efficiency
    • Improving comfort level
    • Decreasing maintenance load & costs
    • Increasing Health & Safety level
  • Project characteristics

    Hekmat  buildings projects includes three main tower D, C, B, respectively, which each contains  6, 10 and 14 floors in West of Tehran and  Sheikh  Fazlullah Exp. way are located. These buildings have central air conditioning systems and all intelligent building management systems have been used in these towers.

  • Objectives

    HEKMAT office buildings contain several important agencies. Our aim was to provide comfort and create a good working condition for all staff who work in these premises.

    Our main objective was to reduce energy cost but not to reduce standard of health and safety level for all employers.

    The HEKMAT buildings are located in an open air area in west of Tehran near mountains geographically.  Poor wall installation caused the energy consumption being very high.

    We installed more than 40,000 installations and installing in a second cover of double glassing windows. Also we could control energy management for out of office hours times.

     

  • Solutions

    Tacwin company in order to tackle these objective has provided an Integrated Intelligent Building Management system (BMS). Systems presented in this section include control of cooling, heating and air conditioning and also control building lighting. Reduce energy consumption with effective and accurate control on these systems commensurate with the presence of individuals and environmental conditions outside the building, control scenarios by experts in the company are noticed. These plans provide comfort environmental conditions, reduced energy consumption and the proportion of energy consumption with the presence of people is considered. In HVAC field, with control mechanical room equipments, including central chillers, boilers, pumps, booster pumps, coils and resources cooling towers and downstream equipment such as fan coil AHUs predicted to be at least 40% energy efficient buildings be seeking, also with lighting control predicted to be at least 15% energy saving. Due to the precise control of the building can be prevented equipment depreciation inapposite; is expected that maintenance costs a considerable amount of saving. Also through these systems, BMS systems as well as building access control integrated in out of office time will be diagnosed. To achieve the desired results of the company products tac (Schneider Electric) has used and relying on scientific and technical experts can take the responsibility to design and implementation of these systems has been and now is able to Hekmat project done successfully.